Chloride attack in the Gulf is not a question of whether, only of when — and of whether you intervene while it is still a repair.
Concrete in a marine climate fails in a sequence that is entirely predictable. Chloride penetrates the cover. The passive layer on the reinforcement breaks down. The steel corrodes and expands, and the expansion cracks and then spalls the cover away. Once the cover is gone, the corrosion accelerates because the steel is now exposed.
The repair is straightforward when it is caught early and progressively less so afterwards. What makes it go wrong is patching the visible damage without addressing the chloride in the surrounding concrete, which simply moves the corrosion cell to the edge of the patch.
Assessment first
- Delamination survey by hammer tap or impact echo
- Cover meter survey and reinforcement location
- Chloride profiling and carbonation depth testing
- Half-cell potential mapping where corrosion activity is in question
- Breakout extent defined by the survey, not by what is visibly spalled
Repair
- Breakout to sound concrete and behind the reinforcement
- Reinforcement cleaning, or replacement where section loss exceeds the allowable
- Reinforcement priming and bond coat application
- Reinstatement with polymer-modified or flowable repair mortar
- Structural and non-structural crack injection — epoxy or polyurethane as the condition requires
- Anti-carbonation and protective coatings to extend the repair life
Where repair is not enough
If the assessment shows the member no longer has the capacity it needs — because of section loss, or because the loading changed — repair restores durability but not strength. CFRP strengthening is how capacity is added back.
Standards we work to
- EN 1504-3
- EN 1504-5
- EN 1504-9
- EN 1504-10
- ACI 562
- ICRI 310.2
- ASTM C1583
Common questions
What clients ask before awarding
Why does patch repair sometimes fail within a year?
Do you survey before quoting?
Epoxy or polyurethane injection?
Can you repair and strengthen in the same visit?
Send us the drawings. We will tell you what it takes.