Dewatering
Dewatering services
Eleven diesel pump sets, six sedimentation tanks and over 400 metres of discharge hose — owned, maintained and run by our own crews.
Bahrain’s water table is shallow enough that most excavations of any depth meet it. Dewatering is not an optional refinement here; it is the thing that decides whether the excavation can be worked in at all.
Two systems, chosen by ground
Wellpoint dewatering
A ring of closely spaced shallow wellpoints connected to a common header and a vacuum pump. Effective for drawdown of a few metres in permeable sandy ground, quick to install and quick to move. The standard answer for pipeline trenches and shallow basements.
Deep well dewatering
Individually pumped bores with submersible pumps, drawing down over a wider radius and to a greater depth. Slower and more expensive to install, and the only option where the drawdown required exceeds what suction can deliver or where the formation is less permeable.
Discharge is the part that catches people out
Abstracting the water is straightforward. Discharging it legally is not. Groundwater carrying suspended solids cannot simply be put into the storm system, so our six sedimentation tanks sit between the pumps and the discharge point and the consent conditions are met by design rather than by argument afterwards.
Plant
- Eleven diesel pump sets, 6-inch and 4-inch, on Kirloskar engines
- Six sedimentation tanks
- Over 400 metres of discharge hose
- Wellpoint headers, risers and jetting equipment
- Submersible pumps and controls for deep well installations
- Standby sets to keep drawdown continuous through maintenance
Standards we work to
- BS EN 1997-1
- CIRIA C750
- CIRIA C515
- BS 5930
Common questions
What clients ask before awarding
Wellpoint or deep well — which do I need?
How do you handle the discharge?
What happens if a pump fails overnight?
Can you combine dewatering with shoring?