Ground engineering
Ground engineering
Bahrain’s water table is shallow and its ground is variable. Excavation here is a dewatering problem and a retention problem at the same time — and we own the plant for both.
On most sites in Bahrain, groundwater arrives before the excavation reaches formation level. Shoring without dewatering floods; dewatering without shoring draws the ground in. The two scopes are usually let separately, and the gap between them is where programmes are lost.
We own the vibro hammers, the excavators, the pumps and the tanks, and we run them with our own crews. That means the shoring sequence and the drawdown programme are planned together by people who answer to the same project manager.
Owned plant, not hired in
Three vibro hammers — ICE Netherlands, Alkor Korea and a 22-tonne SY220 — allow parallel working and leave a spare when one goes down. Eleven diesel pump sets in 6-inch and 4-inch, six sedimentation tanks and over 400 metres of discharge hose cover drawdown and discharge without sub-hire.
The earthworks and retention plant is ours as well, so an excavation can be dug, retained, trimmed and reinstated without a hire desk in the sequence:
- Excavators, backhoe loaders and skid-steer loaders
- Dump trucks for muck-away and import
- Rollers for reinstatement and formation compaction
- Rock breaker attachments for Bahrain’s caprock
- Pile trimmer for cutting piles down to cut-off level
- Sheet pile sections and steel frames for walings and strutting
- Vibro hammers for driving and extraction
- Dewatering pump sets, sedimentation tanks and discharge hose
Capability at a glance
- Sheet pile driving and extraction, driven and vibrated
- Wellpoint dewatering systems for shallow drawdown
- Deep well dewatering for deeper formations and long-duration abstraction
- Bore holes, submersible pump installation and abstraction management
- HDPE geomembrane lining for lagoons, bunds and containment
- Sedimentation and discharge management to meet consent conditions
Confined space entry
Excavation work in Bahrain routinely becomes confined space work — manholes, pumping chambers, sumps, culverts, wet wells and deep shored pits all qualify once they are deep enough and poorly ventilated. Our crews are certified and equipped for it rather than improvising on the day.
- Confined space certified manpower — entrants, attendants and entry supervisors, training records issued per crew
- Self-contained breathing apparatus (SCBA) sets and positive pressure respirators
- Gas detection sets for pre-entry testing and continuous monitoring during occupancy
- Tripod rescue winch and retrieval harnesses for vertical entry
- Forced-air ventilation, intrinsically safe lighting and low-voltage tooling
- Permit-to-work discipline, isolation verification and standby rescue arrangements
Services
What sits under ground engineering
Sheet pile shoring
Driven and vibrated sheet pile walls with three vibro hammers and parallel-working capacity.
View →Dewatering services
Wellpoint and deep well systems, eleven diesel pump sets and six sedimentation tanks.
View →Bore well & pump solutions
Bore holes, submersible installation, pump sizing and long-term abstraction management.
View →Geomembrane installation
HDPE liner welding for lagoons, bunds and containment, wedge and extrusion welded.
View →Demolition & site preparation
Controlled demolition, concrete coring, clearance and formation preparation.
View →Elsewhere on site
Our other disciplines
Piping & Process Systems
See the full capability and the services it covers.
View →Civil & Structural Repair
See the full capability and the services it covers.
View →Industrial Maintenance & Shutdown
See the full capability and the services it covers.
View →Fabrication, Electrical & Insulation
See the full capability and the services it covers.
View →Trading & Rental
See the full capability and the services it covers.
View →Surface Protection & Coatings
See the full capability and the services it covers.
View →MEP Services
See the full capability and the services it covers.
View →Send us the drawings. We will tell you what it takes.
BOQ, isometrics, specifications or a full tender package. Acknowledged within one working day, with the machine schedule and programme in the offer.